ðóñ
óêð
eng
pol
Ïðîåêòíî-áóä³âåëüíà êîìïàí³ÿ
Ïðîåêòíî-ñòðîèòåëüíàÿ êîìïàíèÿ
Planning & construction company
Spółka budowlano-projektowa
About company
Objects
Management
Construction
Designing
Contacts
Development
Technology
Tenders
News
Vacancies
Partners
SEARCH

News

 

May 2010. The first common project of “Ukraine investing newspaper” (Investgazeta).  May 20, 2010. The first common project of “Ukraine investing newspaper” (Investgazeta) and independent Credit rating agency was published. It is dedicated to the 10 years period of development of Ukrainian economy. It is unique product which contains the research of Ukrainian economy of 10 years and determines the leaders of different business branches of Ukraine. The result of such research is... 
September 2009. AEROBUD Company performs piling works in Internationa Airport “Borispyl”.. AEROBUD Company signed the contract and started piling works at terminal “D” which is constructed in International Airport Borispyl.   According to the contract more than 2 500 running meters of piles with diameter of 620mm and more than 11 000 running meters of piles with diameter of 880mm are to be done. The term of the works is 3 months.... 
July 2009. Shot – resistant doors manufactured by JSC “AEROBUD” got the certificate of UkrSEPRO.. In July 2009 AEROBUD company finished self manufactured doors for tasting in licensed laboratories. As a result of the tests of laboratories for strength, thermal conductivity and refractoriness the certificate of UkrSEPRO ¹ UA1.16.0049460-09 was granted. The AEROBUD’s production got the highest first category... 
May 2009. «Olgrade» is a residential complex on the bank of the Dnipro River.. In May 2009 AEROBUD Company get to the construction of new object - residential complex “Olgrad”, in Vizhgorod town, Kyiv region. Currently our specialists work at sanitary engineering works (water piping and rain canalization, heating system, steam system, pumping stations, ventilation etc.) and finishing works (plastering, puttying, painting, and tiling).... 
April 2009. The residential building ¹ 1 of the Park Avenue complex is finished in monolith.. In December 2008 the Aerobud Company started the construction of the Park Avenue residential complex. In April 2009 monolithic and frame works of residential building ¹1 were done by our specialists. Currently the installation of ferroconcrete frame of the building ¹ 2 and shopping mall is taking place. Also the brickwork of the inner and outside walls of the... 
June 2009. AEROBUD is a member of the association “The Airports of Ukraine”. In June 2009 the conference of the association of "The Airports of Ukraine" took place in Alushta (Crimea). Aerobud Company was among participants. Our representatives took part in seminars and forums which have been hold in the frames of the conference. The most important question was the preparation of Ukraine for the football championship Euro 2012. When round-table discussion our experts... 
November 2008. Reconstruction of Krasnodon Regional Order of Nations’ Friendship - the Museum of “Young Guard”..           In the beginning of November 2008 the filial of AEROBUD "Aerobud - Lugansk" won the tender for reconstruction of Krasnodon Regional Order of Nations' Friendship - the Museum of "Young Guard" (Lugansk region, Krasnodon town, 6 Komsomolskaya St.).          ... 
October 2008. Construction works of renovation of bridges in Ivano – Fronkivsk region..           In the results of heavy rains and weather conditions the flood took place in the territory of Zakarpattya region. The most difficult situation was in Ivano – Frankivsk region, which appeared to be in the center of disaster. As the result all buildings, works, bridges and roads were destroyed ... 
August 2008. Participation in the international economic forum «UKRAINE: NEW OPPORTUNITIES»..  Aerobud Closed Joint Stock Company took part in the international economic forum "UKRAINE: NEW OPPORTUNITIES". Forum was held in the National complex "Expocenter Ukraine" on 20-21 August 2008 under the auspices of Ministry of Economy of Ukraine. ... 
August 2008. The Ground Breaking Ceremony of Kiev MLP- Chaika, the largest investment grade logistics project class “A”.. The Ground Breaking Ceremony of Kyiv MLP-Chaika , the largest investment grade logistics project class “A” on Ukraine, took place on October 11, 2006. MLP-Chaika is situated in the Kyiv-Sviatoshynsky district of Kyiv region. Currently MLP-Chaika is the largest... 
«1»  23/       / 1−10 (Σ=27) /
Realized projects
Branches of "AEROBUD"
Subsidiary company “Aerobud - Lugansk”
Director – Anatoliy Reva
122 a, Lunacharskogo St., Lugansk 91055
tel: +38 (0642) 71-88-64 Subsidiary company “Aerobud – Vostok”
Director – Grigoriy Smerdyuk
33, Frantishek Kral St., Kharkov 61115
tel: +38 (0572) 94-59-37 Subsidiary company “Aerobud – Odessa”
Director – Alexander Kulyinskiy
32, Kosmonavtov St., Odessa, 65078
Tel: +38 (048) 734-36-55 Subsidiary company “Aerobud - Dnepr”
Director – Anatoliy Grechin
149, Geroev Stalingrada Avenue, Dnepropetrovsk 49057
Tel: +38 (0562) 32-33-15 Main office “Aerobud”
4, Pshenichna St., Kyiv 03148
President - Chairman of the Board, Oleg Bokiy
Reception Office tel.:+38 (044) 503-05-69, 451-47-41 Subsidiary company “Aerobud - Zapad”
Director – Pavel Melnik
111, Zelena St., Lvov 79000
tel: +38 (032) 294-96-68 Subsidiary company “Aerobud – Yug”
Director – Nikolay Paliy
23, Krasnoarmeyskaya St., Yalta 98604
tel: +38 (065) 423-24-08
© AEROBUD, 2008
© CiM, 2008 - ñîçäàíèå ñàéòîâ, ðàçðàáîòêà ñàéòîâ, ñîçäàòü ñàéò ïîèñê àäðåñîâ