July 2008. The full-strength pavement reconstruction of the Dnepropetrovsk Airport."Aerobud" JSC is carring out the reconstruction of the Dnipropetrovs’k Airport within frameworks of preparation for Euro-2012. Our specialists have launched the first stage of works - the repair of the pavement (35km as a whole). This maintenance work are carried out only at night, keeping up with flights (!), so it is demand from specialists a due care and work performance on a tight schedule (the "time-windows" is determined by airport flight service). "Aerobud" JSC makes a contribution to preparation for the 2012 UEFA European Football Championship by execution of the construction works of the social and transport infrastructure objects.
|
|
Realized projects
|
Branches of "AEROBUD"
|
|
|
|
|