Airports and objects of aviation infrastructureSince 1999 “AEROBUD” JSC has been specializing in repair of airline surfacing. Aerodrome department has performed the assembling and dismantling of concrete paving by vacuum method, repair of paving (strained seams and spalls).
The schedule of works was mad up according to controller’s office data as the construction works were held simultaneously with airport functioning, and that is why it should be done under time.
In 2003 piling of aerodrome surface of the lot for meeting delegations was done. In two working days during few time windows with duration of 1-3 hours the area of 10 000 m2 was covered with two – ply covering each of the layer was of 5mm.
More over since 2001 “AEROBUD” company performed road construction in cities and towns of Autonomic republic Crimea and Western Ukraine. Among them:
- Yalta: 80 000 m2 in 2001 – 2002 (Trolleybus circle in Kiyevskaya and Moscowskaya streets); - Simferopol: 70 000 m2 in 2003 (in Pobeda and Tankovaya Streets); - Kerch: 80 000 m2 in 2004 (in Gorkogo and Kominterna Streets); - Drogobich: 40 000 m2 in 2004- 2005 (in Striyskaya, Sambirskaya, Lesy Ukrainky Streets).
Piling of thing emulsion – mineral mixture needs wealth experience in road construction with compulsory laboratory testing of it. Currently we reconstruct take-off and landing strip in Dnipropetrovs’k Airport. |
|